Pointe Sud-Ouest
Martinique
Pointe Sud-Ouest
Project Description
- Lease Size 15320 Acres
- Reservoir Depth: 2000M
- Expected Temperature: 150 – 200°C
- Expected Flow: ≥450 m3/hour per production well
- Power Capacity: 10 MWe
- Yearly Production: 80 GWh
- COD: 2029
The Pointe Sud-Ouest project, located in Martinique Island, was granted to TLS in june 2024 through the Pointe Sud-Ouest geothermal exploration permit.
TLS started geological exploration in early 2024 and will conduct geophysical and geochemical surveys in 2025. Geothermal potential will be assessed by TLS geoscientists before defining the drilling targets.
Previous slide
Next slide