GeoPulse
France - Massif Central
GEOPULSE
Project Description
- Lease Acres 12850 (52 km²)
- Reservoir Depth: 3000-3500 m (9840-11480 ft)
- Expected Temperature: 170-200°C
- Expected Flow ≥ 360 m3/hour per production well
- Power Capacity: 12 MWe (2×6)
- Yearly Production: 80 GWh
- COD: 2030
The Geopulse project, located in the French Massif Central (France), is developed by TLS since 2019 in collaboration with Storengy, a subsidiary of ENGIE. The project is located within the larger Sioule geothermal exploration license, secured since 2017.
TLS realised the exploration between 2015 and 2019, including geology, geophysics and geochemistry. Geothermal potential was confirmed by the exploration process and the drilling permit was granted in 2022 for 4 wells. The first exploration drilling is expected to start in late 2025.
More Details: https://www.geopulse.fr