Granite Springs Valley

NEVADA, USA

Granite Springs Valley

Project Description

  • 4 Leases – 12273 Acres
  • Reservoir Depth: 1500M = 5000 feet 
  • Expected Temperature: 150-200°C, 300-400˚F
  • Expected Flow: ≥360 m3/hour per production well
  • Power Capacity: 30 MWe gross (25 net)
  • Yearly Production: 228 GWh
  • COD: 2030

The Granite Springs Valley project, located in Pershing County, was acquired by TLS in 2023 after DIG4GEO predicted a high geothermal favorability at this location. The project includes four geothermal leases on federal lands. No surface manifestations are present in this area.

TLS started exploration surveys, including geology, geophysics and geochemistry in early 2024. Data are currently being analyzed to confirm the geothermal potential of the area. Drilling targets for exploration drillings will be defined to start the permitting process in 2025.

Previous slide
Next slide